Case Study

Case Study — Stay on Schedule: Eliminating Field Delays for Mid-Size Contractors

See how this mid-size general contractor used real-time construction management and progress tracking tools to reduce construction delays and improve project scheduling with GoBuid.

|

by Oscar Lo

|
Case Study — Stay on Schedule: Eliminating Field Delays for Mid-Size Contractors banner
Case Study — Stay on Schedule: Eliminating Field Delays for Mid-Size Contractors

Contractor
Mid-size General Contractor

Project
Mixed-use mid-rise development (residential over retail)

Solution

GoBuid Platform includes:

  • Live site updates (progress % & tasks )
  • Track Map (manpower & equipment)
  • Embedded task comments with file uploads

Issues

  • Crews fall behind when the office lacks real-time status updates that trickle in via texts, paper & email
  • PMs scramble to reassign labor or equipment after discovering delays days later
  • Site-to-office hand-offs create blind spots, causing safety or quality hold-points to cascade

Goals

  • Surface site issues the moment they occur to prevent delays
  • Keep crews productive with instant visibility into manpower & equipment
  • Enable project leaders to make proactive, on-the-fly adjustments

Steps to Success

1. Kick-off & Setup 

  • Integrate project info, progress tracking items, and task list 
  • Download the GoBuid app for the crew to update on-site

2. Field Roll-out

  • Crews update tasks & manpower/equipment usage in-app as work completes

3. Dashboard Configuration

  • Overdue/missed tasks automatically send notifications to doers and watchers.
  • Utilize built-in comments/attachments with tasks, no more scattered update channels

4. Monitor & Adapt

  • Daily and weekly review: allocate tasks, manpower, and equipment resources based on data. 

Outcomes (first 4 weeks)

  • 80% fewer site-to-office delays, with live updates replacing end-of-day reports
  • 50% fewer construction defects, thanks to instant equipment status & task-completion alerts
  • 3× faster team communication with visibility—issues surface in minutes instead of days

Benefits

  • On-time milestones become the norm, not the exception
  • Proactive resource management slashes downtime and emergency mobilizations
  • Sharper safety & quality control as hold-point delays get flagged—and closed—immediately
  • Data-driven scheduling gives leadership confidence in data-driven decisions
  • Scalable model for any build type: residential, commercial fit-out, or core & shell

 

👉Get Free Set-up + Onboarding Right Away! 

Promo Code: GB44

1 on 1 Live Demo

Enter your email or phone number, our sales team will contact you immediately.

GoBuid 1 on 1 Live Demo Image 1GoBuid 1 on 1 Live Demo Image 2
case study general contractor cuts construction delays | GoBuid